Page 1 of 1

Sweep on 1 2400 while measuring continuously on the other

Posted: April 1st, 2011, 8:58 am
by peterdeeb
I'm using 2 2400's. One will be performing a sweep as fast as I can make it go. I need to try and measure the current for a second 2400 starting the same time. I don't know if this is possible but if it is how would I accomplish it. Pseudo code would be good as I'm doing this in Measurement Studio with GPIB commands. I've been playing with setting up a trigger link manually but don't have much experience with it so am not having much success.

Re: Sweep on 1 2400 while measuring continuously on the othe

Posted: April 7th, 2011, 3:05 pm
by Andrea C
Hi,

Check out the app note on the web site for "Trigger Synchronization of Multiple Series 2400":

http://www.keithley.com/support/data?asset=3670

There are a couple different scenarios covered and the SCPI commands are included.

Andrea